erp-manual:cloud:warehouse:material-downgrade
Table of Contents
Create New Material Downgrade
Overview
- It is same as Material Adjustment
Downgrade Rules
- At least one Item should be added which is negative quantity for Downgrade From
- This has to be a Batch Item
- At least one Item should be added which is positive quantity for Downgrade To
- This can be a Master Item, or Batch Item
- Specify the cost of the Item if Master is selected, so that new Batch will have the give cost
- System will not Validate if the quantity of Downgrade From and Downgrade To is same or not, it is allowed to be different
erp-manual/cloud/warehouse/material-downgrade.txt · Last modified: by 127.0.0.1
