Table of Contents

Update Task

Overview

Update Task in SarasX Mobile App allows the user to record the latest task progress, change the task status, provide due date when required, and save the update in one flow.

This is useful for:

Step 1: Open the Update Tab

System shows the task update form configured for that task type.

Step 2: Provide the Update Text

The text entered here becomes part of the task log trail.

Step 3: Change the Status

Examples of status movement may include:

Note: The actual status values are controlled by SarasX configuration for that tenant.

Step 4: Provide the Date if Visible

This field may represent different meanings such as:

The exact label depends on the task document configuration.

Step 5: Add Images if Required

Selected images are prepared and uploaded as part of the task update flow.

Step 6: Save the Update

During save, SarasX Mobile App may show progress such as:

After save:

Important Points